What would change on the ground
The release area was rezoned for housing in 2022 by the then Minister for Planning,
through a rezoning review. Since then the council has adopted a site plan for it, signed a
planning agreement with the developer and approved the first stage of the subdivision. Its
planning proposal
(PP-2026-1778, July 2026) says the zoning has not caught up: in 2022 there was no
mechanism for Council to accept the dedication of land (ie for public open space,
environmental land, stormwater management) and the zoning of the site reflects this.
It lists nine changes to the Kiama Local Environmental Plan 2011. The ones a neighbour or
future buyer would notice are below.
The proposed changes, control by control
Kiama council's planning proposal PP-2026-1778, July 2026, sections 2.1 to 2.9, read 8 October 2026.
| Where | Now | Proposed |
|---|---|---|
| Three local parks: Stage 1 Park (1,950 sqm), Kendall's Park (2,650 sqm), Munna Munnora Park (3,150 sqm) | Low density residential (R2), or environmental management (C3) for Munna Munnora Park | Public recreation (RE1) |
| Creek (riparian) corridors | Mostly rural landscape (RU2), with strips of residential | Environmental management (C3) |
| Six proposed lots on the main collector road in Stage 2, numbered 2055 to 2060 | R2, 300 sqm minimum lot, floor space ratio 0.6:1, 8.5 m height | Local centre (E1), no minimum lot size, floor space ratio 1.5:1, height unchanged |
| Proposed lots around Kendall's Park, numbered 2083 and 2084, 2093 to 2096, and 3047 and 3048 | 450 sqm minimum lot, floor space ratio 0.45:1 | 300 sqm minimum lot, floor space ratio 0.6:1 |
| All other low density residential land on 0.45:1 | Floor space ratio 0.45:1 | Floor space ratio 0.5:1 |
| Land for the Weir Street extension | No acquisition layer | Reserved for acquisition as a local road, the council as acquiring authority |
| Strip of unformed road beside Kendall's Cemetery | On the heritage map with the cemetery (item I144) | Off the heritage map; the cemetery lot stays listed |
| Two road-reserve lots by the highway underpass, one a council-owned pathway to the cemetery | Infrastructure zone (SP2) | Low density residential (R2), 300 sqm minimum lot |
The local centre is new: the proposal says the 2022 rezoning did not include land for
employment uses
. The council's draft Employment Lands Strategy, it says, identifies a need for around 2,000sqm of land area to enable
approximately 500sqm of GFA
(gross floor area) of local shops and services, and the
draft
site plan amendment
to be exhibited with it sets an objective of a minimum of 500sqm of gross floor area
for
commercial or retail use. It would sit in Stage 2 on the collector road, south of a creek
corridor and east of the cemetery and its park.
The heritage change is narrower than it sounds. The proposal says the mapped strip was
part of an old unformed road that gave access to the cemetery before the M1 Princes Highway
cut it off, that it does not contribute to the significance of the heritage item
, and
that the cemetery lot itself stays listed. Two road-reserve lots near the underpass would be
zoned residential so they can be folded into house lots, the proposal says, subject to a
separate road closure process and separate sale of land process.
What the state wants first
Kiama council voted on 18 August, eight to none, to send the proposal to the planning
department for a gateway determination and to ask to make the plan itself
(minutes, item 15.2).
The gateway determination,
dated 29 September 2026 and signed by a director of the Department of Planning, Housing and
Infrastructure as the Minister's delegate, granted that: the amendment should proceed
subject to the following
, with the council as the local plan-making authority. The
first condition is the one that sends the council back to its desk.
Prior to exhibition, the planning proposal is to be updated to provide further justification for the inconsistencies with the Ministerial Direction Planning Priorities P1.2 Cultural Guidance, P3.2 Rural, P5.6 Threatened species, threatened ecological communities and their habitats and P5.9 Planning for Bush Fire Protection
The council's proposal had reached the opposite view on each of the four. It states that
it is consistent with all applicable Section 9.1 Ministerial Directions
, and its
direction-by-direction table records these assessments.
Four directions: what the council's proposal said, and what the gateway asked for
| Direction | The council's proposal, July 2026 | The gateway, 29 September 2026 |
|---|---|---|
| P1.2 Cultural Guidance | This direction does not apply to the PP. | Further justification for the inconsistencies, before exhibition |
| P3.2 Rural | The PP is considered consistent with Direction P3.2. | |
| P5.6 Threatened species, threatened ecological communities and their habitats | The PP is considered consistent with Direction P5.6. | |
| P5.9 Planning for Bush Fire Protection | The PP is considered consistent with Direction P5.9. |
The other conditions add steps before and during the exhibition. The council must first consult the state's bushfire advisers (the Development Coordination Authority's hazards and resources advisory) and take their comments into account. The heritage and biodiversity advisers must each get at least 30 working days to comment, and the proposal must be on public exhibition for at least 20 working days. No public hearing is required.
The deal behind the housekeeping
Most of the changes put into the plan what the council and the developer have already
agreed. The planning agreement
between the council and White Constructions and Developments Pty Ltd was entered into on 5
December 2025 and covers the whole release, which the council's page puts at
approximately 380 lots
(the council's 18 August report says about 400 lots or
dwellings). The developer dedicates and embellishes the three parks, revegetates and hands over
the creek corridors, builds four stormwater basins and upgrades Saddleback Mountain Road and
Weir Street. The agreement's
explanatory note,
prepared jointly by the council and the developer for its 2025 exhibition, says its
notional value
was costed by the developer at over $30 million, which equates to
over $80k per lot.
The subdivision is already moving. The proposal records Stage 1, 81 residential lots,
approved by the council in December 2025, and a development application for Stages 2 and 3,
204 residential lots, lodged in June 2026 and under assessment when the proposal was
written. The Weir Street extension is
a Stage 4 job in the agreement, but the land it needs spans two properties, and the proposal
says one owner is not a party to the Planning Agreement and has no obligation to dedicate
land or construct the road
. That is why it asks for the acquisition layer.
The shops answer a traffic problem the proposal itself records, in the council's words about Transport for NSW's comments on its housing strategy.
Feedback from Transport for NSW on the Kiama Local Housing Strategy has noted that the M1 Princes Highway does not have the capacity to accommodate the additional trips
When residents get a say
The release area's path, and the dates still ahead
- 2022Site rezoned for urban development by the then Minister for Planning, through a rezoning review.
- February 2025Council adopts the site's development control plan chapter, with a concept master plan.
- 5 December 2025Planning agreement entered into; Stage 1 (81 lots) approved the same month.
- June 2026Development application lodged for Stages 2 and 3 (204 lots).
- 18 August 2026Council endorses the housekeeping proposal for gateway, eight votes to none.
- 29 September 2026Gateway determination: proceed, on conditions, with further justification needed before exhibition.
- October to November 2026Target in the council's timeline: agency consultation and public exhibition.
- February 2027Target in the council's timeline: report to council for final endorsement.
- April 2027Target in the council's timeline: plan amendment published.
- 2 July 2027Deadline in the gateway determination for completing the plan.
As at 8 October 2026 the proposal is not on the Planning Portal's list of proposals on exhibition for Kiama, and Kiama's Your Say projects page has no exhibition page for it. The portal lists it as pre-exhibition, at the gateway implementation stage. The council's report says the proposal will be advertised on its Your Say page, and the proposal suggests notification letters to adjoining landowners. When the exhibition opens, we will report its dates and what the updated proposal says on the four directions.
Our read
This is opinion, built on the documents above. Housekeeping is a category
in the council's planning proposal policy, which plans two such proposals a year. Most of
this one is what the label says. Zoning the three parks and the creek corridors for what they will
become, and reserving the land for Weir Street, locks in public land the planning agreement
already promised, and that is good for whoever ends up living there. But two of the nine
changes are more than tidying. Smaller minimum lots around Kendall's Park and a higher floor
space ratio across the low density land change what can be built, and the proposal's own
heading for the first says Increase the density
. Section 3.9 of the same document
says The PP does not propose to increase development potential
. The council's case
for the ratio change, a simpler figure in line with the state's low and mid-rise housing policy,
is reasonable, but residents should be told plainly that it is a change. The department's
request for more on bushfire and threatened species is the right check on a document that
assessed both as consistent in a short paragraph each. Read the updated version when it is
exhibited, and look first at what it says on those two.
How we sourced this
We read the proposal's page on the NSW Planning Portal and its attached documents: the council's minutes and report of 18 August 2026, the planning proposal report (July 2026), the draft amendments to the site's development control plan chapter, and the gateway determination. We read the planning agreement's page and explanatory note on Kiama's Your Say site, and checked the portal's exhibition lists and Your Say's projects page for an exhibition. Lot counts in the lot-number rows are ours, from the ranges the proposal gives. The proposal gives the Stage 1 approval as December 2025 in its background and December 2026 in one later passage, and the council report repeats the later date; we use December 2025, the only date that had passed when the report was written. The council gives the release as about 400 lots or dwellings in its report and about 380 lots in the planning agreement material; we give both. The site's development control plan chapter is dated February 2025 in the proposal's background and the council report, and December 2025 in one table; we use February 2025. The planning agreement itself is a scanned document we could not text-search, so its value is the explanatory note's. Kiama council's main website refuses our automated reads. We have not contacted the council, the department or the developer. The section headed Our read is opinion.
Sources
- NSW Department of Planning, Housing and Infrastructure, South Kiama Urban Release Area, Housekeeping, PP-2026-1778, NSW Planning Portal, and its under-exhibition list filtered to Kiama, read 8 October 2026: stage, addresses, date of determination, the attached documents below, and no Kiama proposal on exhibition.
- Kiama Municipal Council, Minutes of the Ordinary Meeting, 18 August 2026, extract, item 15.2, read 8 October 2026: resolution 26/197OC and the vote.
- Kiama Municipal Council, Report of the Director Strategies and Communities, item 15.2, 18 August 2026, read 8 October 2026: the site's area and about 400 lots or dwellings, the 2022 rezoning, and the two housekeeping proposals a year.
- Kiama Municipal Council, Planning Proposal, Housekeeping, South Kiama Urban Release Area, July 2026, read 8 October 2026: the nine changes and their controls, the parks, the local centre, the heritage strip, the road-reserve lots, the Weir Street landowner, the Transport for NSW feedback, the stage lot counts, the ministerial direction table, section 3.9 and the project timeline.
- Kiama Municipal Council, Kiama DCP 2020, Chapter 12.11 South Kiama Urban Release Area, draft amendments, read 8 October 2026: the neighbourhood shops, their location and the 500 sqm minimum.
- NSW Department of Planning, Housing and Infrastructure, Gateway determination, PP-2026-1778, 29 September 2026, read 8 October 2026: the conditions, consultation periods and the 2 July 2027 completion date.
- Kiama Municipal Council, Planning Agreement: South Kiama Urban Release Area, Your Say Kiama, read 8 October 2026: the date entered into, about 380 lots, and the contributions.
- Kiama Municipal Council and White Constructions and Developments Pty Ltd, Explanatory Note, Planning Agreement: South Kiama Urban Release Area, 2025, read 8 October 2026: the parties, about 380 lots over four stages, and the notional value as costed by the developer.
- Kiama Municipal Council, Your Say Kiama, projects, read 8 October 2026: no exhibition page for the proposal.
Spotted an error, or read these documents differently? Tell us and we will check it against the documents and log the outcome here.